Skip to content
Northpoint

Mezzanine floors

Plan your mezzanine floor

A mezzanine adds a floor inside your building. Enter a few measurements to see the extra space, an initial height check and an estimated budget.

Open any section to make changes. Your drawing and budget update as you go.

01Your space18 m × 12 m footprint

Enter the size of the new floor you want. It can cover part or all of your building.

Measure from the ground to the lowest obstruction, such as a light, sprinkler or roof beam.

02Mezzanine details1 new level · access to confirm
Number of new levels

A level is an extra floor above your existing ground floor.

Clear height is the usable space below each new floor, excluding the thickness of the floor itself.

Access and fire protection requests

The budget uses automatic allowances. Requests below are for discussion and do not change the price or drawing. We will confirm what is required.

Staircases

Stairs let people reach each new floor.

Let our team advise.

Pallet gates

A safety gate where a forklift loads pallets onto the floor.

Let our team advise.

The budget already includes a fire-protection allowance. Switching this off does not remove protection that may be required.

03Fit-out and useChoose what goes above and below

Fit-out means what goes on the floor, such as shelves or offices. Choose a starting point for each floor. These choices update the drawing and the budget for the new floors. Actual loads and the final fit-out will be confirmed with you.

On new level 1
Underneath the mezzanine

Shown to help plan your space. Ground-floor fit-out is not added to this budget.

04Review your choicesCheck, save and choose your next step

This is a starting point for a survey, not a completed design or an order.

A survey confirms the building, floor strength, safe access and fire requirements before a quotation.

Discuss this design

Copying a link saves these choices in the link. It does not send them to us.

18m12m6.5m
18 m × 12 m · 1 new level

Drag or use arrow keys to rotate. This illustration is a guide; stairs and gates are not positioned.

Your mezzanine drawing

18m12m6.5m

Illustrative layout, subject to survey and design. Staircases and gates are not positioned.

Estimated installed budget

£44,000 to £68,500

Excluding VAT · not a quotation

£204 to £317 per m² of new floor

Extra floor space

216

across 1 new level

Initial height check

This fits

There is enough height here for a working floor above and usable space beneath it. Nothing about the height rules this out, so the next question is what sits underneath and where the columns can land.

A height check does not confirm structural suitability. The building and proposed use need a survey.

What the budget includes

Floor structure and installation, automatic access and edge-protection allowances, fire-protection allowance, and structural design and building-regulations work. Access requests are recorded for discussion and do not change this estimate. A survey confirms the final scope and price.

Indicative only, and not a quotation. Prices depend on the condition of your slab, the access to your building and what building control requires, none of which can be established without a survey.

ProvisionalThese budget figures are provisional and await confirmation by our team. Contact us for a quotation after a survey.

Planning your floor

A starting point for your project.

Use the drawing to explore your available space and a budget range. A survey then confirms the details that measurements alone cannot tell us.

What you get here

  • An installed cost, as a range you can put in a budget
  • Whether the height in your building will take a working floor
  • How much floor space you would gain, across one deck or several, and what the floor underneath will still take
  • A drawing you can turn around and show someone
  • A link that holds the configuration, so it survives being sent on

What comes after a survey

  • A column grid set around your racking, doors and traffic routes
  • Floor loading confirmed against what you actually put on it
  • Staircases, gates and edge protection placed where goods move
  • Building regulations and fire protection resolved before steel is ordered

That work needs someone in the building. It is also free to find out where you stand.

How it works

A few measurements, and an answer.

Measure your space

How much floor you want to add, and the height you have to put it in. Measured to the lowest thing in the way, not to the roof.

Choose levels and access

Choose one, two or three new floors. Set the usable height below each one, then tell us about any staircase, pallet-gate or fire-protection requests.

Choose how to use it

Plan open space, pallet storage, shelving or offices on each new floor. Choose what will go underneath too.

Review and discuss

Check your choices and copy a link to keep them. Contact our team to arrange a survey and confirm the design, scope and quotation.

What it is for

The configurator handles straightforward floors in buildings without complications. If the slab is in poor condition, access is tight, or there are sprinklers and columns in awkward places, those change what will actually fit, and someone needs to come and look. That visit is free either way.

Next steps

Discuss your design with us.

Copy your design link to keep the measurements and choices you have made. Our team can review them with you and arrange a survey to confirm the floor, access and final price.

Prefer to talk it through? A survey gets you a proper answer.

Book a survey

We reply within one working day

We use your details only to respond to this enquiry. See our privacy notice.

Questions

Common questions

How accurate is the mezzanine configurator?

It is accurate enough to tell you whether a mezzanine is worth pursuing in your building, and no more than that. It works from the floor area you want, how many decks you want stacked, and the clear height you have, using the standard proportions a storage mezzanine needs. It cannot see your slab, your sprinklers, the columns already in the room or how your forklifts move, and all four change what will actually fit. Treat the answer as a reason to have the conversation rather than as a design.

Can you have a two or three storey mezzanine?

Yes, where the building is tall enough. Stacking decks is the cheapest way to add a lot of floor area, and multi-tier mezzanines are common in picking and e-commerce operations. Height is the limit: every deck needs working space beneath it plus the thickness of the floor itself, so each extra level costs a full storey of clear height. Fire strategy and escape routes also get more involved with each tier, which is worth establishing early rather than late.

Why does the configurator show a cost but not a full specification?

Because they are different things. A cost is what you need in order to decide whether to go further, so it is given up front and in the open. A specification is the work: steel sizes, column grids and floor build-ups come out of a survey and a structural design, both of which take real time to do properly and neither of which can be guessed from three measurements. The detail follows once there is a project.

Is the cost a quotation?

No. It is a range, and it is meant to stay a range. It assumes a sound slab, ordinary access to the building and a rectangular floor, and it covers the structure, the deck, installation, staircases and edge protection, fire protection and the building regulations work. It cannot include what nobody has looked at yet: a slab that needs strengthening, sprinklers or services in the way, or anything building control asks for once it sees the drawings. A survey is what turns the range into a fixed price, and it is free.

What height do I need for a mezzanine floor?

As a working minimum you need about 5.4 metres of clear height inside: roughly 2.4 metres underneath, 2.4 metres above, and around 600mm for the thickness of the floor itself. If forklifts need to work beneath the floor rather than just people, the space underneath has to grow and so does the total. Measure to the lowest obstruction, because sprinklers, lights and roof steelwork all eat into what is really available.

Can I configure pallet racking or shelving here too?

Not on this page: this tool covers mezzanine floors only. Racking and shelving have their own configurator, the storage configurator, which lays out runs of bays on the floorspace you have and answers the same fit and budget questions for them. The two tools work the same way, and each links to the other.

What if my building is awkward?

Then the configurator is the wrong tool and a site survey is the right one. Low ceilings, poor floors, tight access, sprinklers in awkward places and columns in the middle of the room all change what will fit. A survey is free, so finding out costs nothing.

Also here

Racking and shelving get the same treatment in the storage configurator.

Open the storage configurator

Meanwhile

The tool gets you started. A survey finishes the job.

Send us the building dimensions and we will do by hand what no online tool can: measure to the real obstructions, work around what is already there, and put a proper layout and proposal in writing.

Direct line

01138 715 028

Mon–Fri, 08:00–17:30

info@northpointfitouts.co.uk